Skip to main content
SETIS - SET Plan information system
  • Specific report

The water-power nexus of the Iberian Peninsula power system: WATERFLEX project

Details

Publication date
1 January 2018
Author
Joint Research Centre

Description

Water availability influences power generation and its costs. Policies aimed at keeping the water stress index of thermal power plants within acceptable limits are needed. This report provides a model-based analysis of the water-power nexus in the Iberian Peninsula. 

The water-power nexus of the Iberian Peninsula power system: WATERFLEX project

Files

  • 2 FEBRUARY 2021
The water-power nexus of the Iberian Peninsula power system: WATERFLEX project