Fault ride-through
(FRT) is a requirement of many network operators, such that the wind turbine remains connected during severe disturbances on the electricity system, and returns to normal operation very quickly after the disturbance ends.
(FRT) is a requirement of many network operators, such that the wind turbine remains connected during severe disturbances on the electricity system, and returns to normal operation very quickly after the disturbance ends.
![]()
SETIS has recently published the 2011 update to the Technology Map, which is the SET-Plan reference document on the state of knowledge for low-carbon technologies in Europe. It presents a snapshot of the current energy technology market situation.
European Industrial Bioenergy Initiative: Report published on analysis of Expression of Interest
SETIS LIBRARY: TECHNOLOGY INFORMATION SHEETS: For a complete overview of all low-carbon energy technologies, read or download the SETIS Technology Information Sheets. They provide a snapshot of each technology’s installed capacity, ongoing R&D, barriers, needs, a ‘fact file’, infographics and more.
Announcement: Download the 2011 Capacities Map report, which
